Previous Water Studies

The City of Libby has commissioned various studies of the water system and the Flower Creek Dam.  These studies and subsequent reports provide additional insight into the City’s decision to move forward with the proposed water system improvements.

The 2012 Water System Preliminary Engineering Report (PER) is available at the City of Libby offices for review.  The PER serves as the basis for the funding applications to the miscellaneous grant and loan programs.  All other documents related to Flower Creek Dam are available by clicking on the links below.

Dam Replacement Alternative Evaluation Report 2011

Hydro Feasibilty Study 2011

Leak Detection Report 2011

Phase II Flower Creek Dam NTL Report 2010

Final Flower Creek Dam Inspection Report October 2009

TDH Libby Water Preliminary Engineering Review 2002

City of Libby Water Master Plan 1993

City of Libby Water Master Plan 1990